Concrete Walkway Molds Tip 1: Overbuild your forms
Diagonal "kicker" plus stake
The angled 2×4 reinforces the side stake that holds the form vertical.
Every builder has a horror story about forms that bulged or even collapsed under the force of wet concrete. To avoid a horror story of your own, build strong forms. Use 1-1/2-in.-thick boards (2x4s, 2x6s, etc.) except on curves. If you're using 2x4s or 2x6s, place stakes no more than 3 ft. apart. If the forms extend below ground, pack soil against them. If they extend more than 6 in. aboveground, reduce the spacing between stakes and brace each one with a second stake and a diagonal "kicker."
Tip 2: Form curves with hardboard
Create smooth curves
Hardboard is inexpensive form material and is easy to flex into smooth curves.
Hardboard siding is intended for exterior walls, but it's also great stuff for forming curves because it's flexible and cheap. A 12-in. x 16-ft. plank costs about $10 at lumberyards and you can cut it to any width you need. Because it's so flexible, hardboard needs extra reinforcement to prevent bulging against the force of the concrete. If the forms are belowground, place stakes no more than 3 ft. apart and pack soil against them. For aboveground forms, space stakes 16 in. apart. To form consistent, parallel sides for a curved sidewalk, build one side first. Then use a "gauge board"—a 1×4 with blocks screwed to it—to position the other side. In wet weather, hardboard can swell and your perfect curves might become wavy. So if rain is forecast, be prepared to cover your hardboard forms.
Tip 3: Keep stakes below the form tops
Screed without obstructions
Drive or cut off stakes below the form top to make screeding easier.
Stakes that project above forms create a hurdle for your screed board—and screeding concrete is hard enough without obstacles. So before you pour, take five minutes to cut off any protruding stakes. If the tops of your forms are near ground level, make sure your screed board won't drag against the ground; you may have to skim off a little dirt to clear a path for the board.
Top 10 Concrete Walkway Molds Mistakes
1. Ordering just enough. If you're ordering concrete, it's much better to pay $60 for an extra half yard of concrete than to come up short. You don't have to use it all. The driver will haul away the leftovers.
2. Ignoring the forecast. A little rain can destroy a freshly poured slab. Beware of hot, dry weather too. The concrete may set faster than you can finish it, especially if you're a beginner.
3. Working solo. Line up more help than you think you'll need. Extra help not only lightens the workload but avoids situations where the concrete hardens faster than you can work.
4. Not being ready. A big concrete pour is a rush job. Don't add stress by waiting until the last minute to finish forms or gather tools. Have everything done and all your tools handy long before the truck pulls up.
5. Using wimpy wheelbarrows. A heavy load of concrete can crush a garden wheelbarrow. Use heavy-duty models only, even if you have to rent them ($15 per day).
6. Relying on fiber. The tiny fibers added to some concrete mixes may reduce surface cracking, but fiber is no substitute for metal rebar or wire mesh.
7. Finishing with extra water. It's tempting to sprinkle a little water on the surface while you're troweling to help you get a smooth finish. But it weakens the surface and will lead to flaking later.
8. Getting burned. Some people can tolerate hours of skin contact with concrete. Others end up in the emergency room with severe burns. Don't risk it: Wear gloves and long pants, and wash concrete off skin immediately.
9. Tearing off forms too soon. It's easy to break off concrete edges while removing forms. So let the concrete harden for at least two days first.
10. Forgetting your autograph. Be sure to scratch your initials in the concrete before it hardens.
Tip 4: Put down a solid base
Pack the base
A plate compactor is a heavy vibrating machine that solidly packs a soil or gravel base.
A firm, well-drained base is the key to crack-free concrete. The best plan for a solid base usually includes compacted soil followed by several inches of a base material such as gravel. But the best base depends on climate and soil conditions. So talk to a local building inspector who's familiar with conditions in your neighborhood. Packing the soil with a rented plate compactor is always a good idea, but you may be able to skip the gravel altogether if you have sandy soil.
Video: How to Pour a Concrete Slab
ⓘ
Tip 5: Plunge out the bubbles
Pack the concrete
Packing the concrete forces out air bubbles and voids that weaken a slab.
When you pour concrete, air pockets get trapped against forms, leaving voids in vertical surfaces. That usually doesn't matter on sidewalks or driveways. But aboveground, on stairs, curbs or walls, the results can look like Swiss cheese. To prevent that, just grab a 2×4 and "plunge" all along the forms. Then go all along the forms with a hammer, tapping the sides.
Tip 6: Avoid too much water
When you have concrete delivered, the first words out of the driver's mouth may be "Should I add some water?" Unless the concrete is too dry to flow down the chute, your answer should be "No, thanks." The right amount of water is carefully measured at the plant. Extra water weakens the mix. More water makes it easier to work with right away, but will lead to a weaker slab.
If you're mixing your own concrete, do this test: Plow a groove in a mound of concrete with a shovel or hoe. The groove should be fairly smooth and hold its shape. If it's rough and chunky, add a smidgen of water. If it caves in, add more dry concrete.
Tip 7: Don't delay floating
Bull float in action
Use a bull float to flatten large areas immediately after placing the concrete.
Close-up of mag float
Use a magnesium or wooden float to flatten smaller areas.
After screeding concrete, the next step is to "float" it. Floating forces the stones in the mix down and pulls the cement "cream" to the surface so you can trowel or broom the surface later without snagging chunks of gravel. If you wait too long and the concrete begins to stiffen, drawing the cream up is difficult or impossible. So the time to float is right after screeding. On a long sidewalk or driveway, it's best to have a helper who can start floating even before all the screeding is done. There is one reason to delay floating, though: If puddles of water form on the surface after screeding, wait for them to disappear before floating.
On small projects, you can use a hand float made from wood or magnesium (both at home centers). The "mag" float glides easier for less arm strain. But for bigger projects like driveways or patios, don't mess around with a hand float. Instead, rent a bull float. The long handle extends your reach and makes the job easier, while the broad head covers the surface quickly and flattens out any bulges or depressions. To make the surface as flat as possible, float it in both directions.
Recipe for a Lasting Concrete Driveway
Too many builders—pros and DIYers alike—treat a driveway just like a patio or sidewalk. But because they support vehicles, driveways deserve some extra effort and expense. Whether you're hiring a contractor or doing it yourself, here are three suggestions for a stronger slab:
Thickness: Most driveways are 4 in. thick, but consider a 5-in. slab. That extra inch of concrete increases the strength of the slab by about 50 percent but increases the cost of a typical driveway by only $200 to $300.
Reinforcement: There are two ways to reinforce a concrete driveway: with rods of rebar or with wire mesh. The purpose of reinforcement is to reduce cracking and to hold the slab together if it does crack. Rebar does both jobs better and costs only a few bucks more for a typical driveway.
Base: What goes under your driveway is just as important as the driveway itself. The best base varies according to climate and soil conditions. It may be a 16-in. layer of special base material or 6 in. of compacted gravel. To get advice, talk to a building inspector who's familiar with soil conditions in your area. If you're hiring a contractor to do the job, be sure the bids describe the base in detail. And don't choose a low bid that skimps on the base work.
Tip 8: Cut deep control joints
Cutting a control joint
Hand cut control joints with a special groover and straightedge while the concrete is still soft.
Close-up of groover
A groover has a blade (typically 1-in.) on the underside that cuts the groove.
The grooves in concrete are called "control joints" because they control cracking. Concrete shrinks as it dries, so cracks have to happen somewhere. Control joints create straight breaks rather than an ugly spiderweb pattern. They also limit cracks that form later. On a sidewalk, space joints 5 ft. apart or less; on a slab or driveway, no more than 10 ft. apart.
There are two ways to make control joints: Plow them in the wet concrete right after floating or cut them the following day with a saw. You can buy a diamond blade for your circular saw at home centers. Creating joints with a "groover" in wet concrete is less work and less mess. Joints should be at least one-fourth the depth of the concrete. A groover that cuts 1-in.-deep grooves costs about $25. If you have an inexpensive version ($7) that doesn't cut deep enough, use it to create the initial joint, then deepen the cut with a stiff putty knife.
Tip 9: Finish with a broom
Broom the finish
A stiff broom creates a slightly roughened concrete surface.
A smooth, steel trowel finish is too slippery for outdoor concrete. Instead, drag a broom over the concrete. You'll get a nonslip texture and hide imperfections left by floating or troweling. You can use a plain old push broom, but a special concrete broom cuts finer lines. The sooner you start, the rougher the finish. Make your first pass about 15 minutes after floating. If the texture is too rough, smooth it over with a mag float and try again in 15 minutes. Drag the broom over the concrete in parallel, slightly overlapping strokes. You may have to rinse off the broom occasionally to avoid a too-rough finish.
Tip 10: Slow the curing
Cover with plastic
Plastic sheeting keeps the moisture in the concrete and aids curing.
Water is essential for the chemical process that makes concrete harden—the longer concrete stays damp, the harder and stronger it gets. One way to slow down drying is to cover concrete with 4-mil plastic sheeting. When concrete is hard enough so you can't make an impression with your finger, gently spread the plastic. Stretch it out to eliminate wrinkles and weigh down the edges to seal in moisture. When you see signs of drying, lift the plastic and gently sprinkle on more water. Keep a sidewalk or patio damp for three days. Seven days is best for a driveway. Plastic can cause mottled coloring on concrete, but the splotches disappear in a month or two.
Pros often skip the plastic and spray on a waxy liquid "curing compound" to slow down evaporation. Though not as effective as plastic, curing compounds are easy to apply with a garden sprayer. Curing compounds are available at home centers.
Required Tools for this Project
Have the necessary tools for this DIY project lined up before you start—you'll save time and frustration.
You'll also need a shovel, leather gloves, plastic gloves, a plate compactor (rental), a bull float (rental), a mag float, a groover and a stiff push broom.
Required Materials for this Project
Avoid last-minute shopping trips by having all your materials ready ahead of time. Here's a list.
Similar Projects
How To Make A Garden Path With Concrete Forms
Source: https://www.familyhandyman.com/project/tips-to-build-a-concrete-walkway/
Posted by: jacobsoulding.blogspot.com
0 Response to "How To Make A Garden Path With Concrete Forms"
Post a Comment